A Simple Guide  before you plan your Residential Demolition.

  • See to it that you allow a reasonable time for permits before the demolition starts.  There are many regulatory agencies and you need to comply with certain formalities and obtain a demolition permit.  This might entail contacting the state or municipality authorities, the neighborhood planning unit and sometimes even the historic preservation board.
  • Look for an insured demolishing organization and have a written contract drawn out with them.  You must certainly verify the relevant insurance documents or certificates of the company.  It would be best if the demolition company is underwritten by a top insurance carrier.
  • Sometimes permits and regulations are required for research.  If there is any homeowner’s association involved, then you need their approval too.  There might be restrictions to the hours of demolition or the placing of dumpsters. In some cases, you may need a historic preservation board’s approval if your building is located in a historic district, as you may be fined without a proper permit.
  • Make a list of all the bodies that need to certify and give approval before you plan a residential demolition.  You need to apply for a permit and pay the required fees and enter into bonds with each of them separately, if necessary.
  • You need to get the site inspected for any hazardous material before residential demolition, such as wells, septic tanks, asbestos, and rodents and so on.  Asbestos may pose a problem in old buildings in the form of shingles, pipe insulation and so on. Asbestos can become dangerous when demolition takes place, as its fibers can get trapped in the lungs causing breathing problems and even lung cancer.  The inspectors locate the presence and get it removed by a licensed asbestos abatement company.
  • Important utilities such as gas, water and sewer, electricity, telephone, cable etcetera should be disconnected before you plan a residential demolition, as Municipalities might demand a written verification for the same.
  • You may also need to submit a Project Notification form to the Environmental Protection Division, especially if the demolition involves asbestos, the notification must be given before the removal of the asbestos.
  • Some components that can be recycled and these should be diverted to landfills.  Based on the type of material, these can be removed and then either reused or recycled.  Though it proves quite costly, it is more favorable to the environment.  Bricks, doors, aluminum siding, copper tubing, flooring, concrete can be recycled.
  • Erosion control needs to be done by contacting the relevant company for purposes like silt fence installation, seeding, straw distribution, slope matting, tree protection fences, and storm drain inlet protection services.
  • Finally, for any residential demolition, an inspection has to be done with a government inspector and for this you need to post a copy of the site plan made to scale along with the permit obtained.  Inspectors ensure that all the above safety measures have been attended to properly.  Keeping in mind the above points, before you begin you plan a residential demolition, might save you a lot of headache later.